The conveying system consists of 2 grab cranes that feed receiving hoppers HP-1 and HP-2 respectively, located on the port side of the FTS.
From each of the two hoppers, the product is extracted by belt feeders ES-1 and ES-2 and then conveyed onto collector belt conveyor BC-1, arranged longitudinally on the port side of the FTS. From here, the material is transferred to cross belt conveyor BC-2, installed at the stern of the FTS.
Belt conveyor BC-2 transfers the load to longitudinal belt conveyor BC-3, installed on the starboard side of the FTS, which in turn conveys the material to the boom belt conveyor of ship loader SH-1, also installed on the starboard side of the FTS.
Belt feeders ES-1 and ES-2 will be prepared, by means of bolted-type support beams, for the future installation of load cells. This will make it possible to weigh the entire equipment and, consequently, to monitor the product flow rate extracted from each hopper, as installing a belt scale on the feeders is not recommended.
A belt scale is provided on belt conveyor BC-1 to monitor the material flow rate.
Given the configuration described above, automatic regulation of the flow rate of the belt feeders, aimed at blending two different grades of cargo in the required ratio, up to 20%-80%, is not technically feasible and is therefore not included in this offer.
Ship loader SH-1 is fitted with 1 electric winch for lifting the bulldozer, with a capacity of 10 tonnes, installed in the lower part of the ship loader structure, approximately 20 m from the starboard side of the transhipper. This position must be confirmed on the basis of the final dimensions of the OGV.
The winch will be used to lower the bulldozer onto the OGV hatch in order to level and distribute the cargo. This operation may only be carried out in certain environmental conditions, with moderate wave height and wind speed.
The following accessories, included in the electric winch supply, will be fitted with RINA marine certification:
• Steel wire rope
• Wedge sockets with clevis pin
• Block with sheave
The conveying system will be controlled from a cargo control room located inside the wheelhouse on the navigation bridge, at +17,900 mm above the ship’s baseline, BL.
The power and control electrical panels required to operate the conveying system will be installed in an electrical room built into a 20-foot marine container, located at main deck level, close to the ship’s superstructure.
All the equipment making up the conveying system can be operated from the main console installed in the cargo control room, or from a local control station located near the relevant drive unit, for maintenance operations.
In addition, all the ship loader functions, including but not limited to:
• Vertical luffing of the boom
• Slewing of the boom
• Shuttle extension
• Rotation and adjustment of the discharge chute
• Bulldozer winch
can be controlled both from the main console and by a radio remote control unit, consisting of a transmitter and receiver, included in the scope of supply of this offer.